Clear
Lake
City Beach
Enhancement

Client
City of Clear Lake
Location
Clear Lake, IA
Completion date
June 2020

As a direct follow-up to the Clear Lake Waterfront Master Plan, an expanded splashpad, restroom and shelter were designed to support the popular beach and lakeshore area of downtown Clear Lake. 

Water play features and water imagery are integrated into horizontal and vertical features throughout. Themed graphics and detailed tile work enliven the structures with waterfront murals and scenes.